Triliad Breaks Ground on Calabasas Building
- Share via
Triliad Development Inc. has broken ground on a $20-million, 87,000-square-foot office building at 26901 Malibu Hills Road in the Lost Hills Business Center in Calabasas.
Cheesecake Factory has signed a lease for one-third of the building, which is scheduled to be completed in June, said Valerie Draeger, president of Thousand Oaks-based Triliad. The project is called Canyon Vista Office Park.
The general contractor is Oltmans Construction Co. The architect is Poliquin Kellogg Design Group.
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.