Centerside II Work Planned
- Share via
Construction could begin as early as December on Centerside II, the $50-million second phase of a two-tower office park in San Diego.
Romualdo (Dudi) Berretti, president of Bowlen Holdings Inc., announced that his firm plans to proceed with the 16-story, 300,000-square-foot building on 13 acres along the San Diego River near San Diego Jack Murphy Stadium.
San Diego-based Bowlen Holdings also developed First Interstate Plaza in downtown San Diego.
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.